Labor rates

Maintain labor cost and selling rates and use hours correctly in assemblies.

Open Costing → Labor to manage reusable labor prices. Keep the rate's unit explicit: a cost per hour and an installation price per square metre are different rates.

Add or edit a rate

Choose New labor rate, then enter the name, unit, optional code/category and description. Set Cost and Sell price in the displayed workspace currency per unit, then save.

Use a name that identifies the crew or work basis, such as installation labor per hour or tiling labor per square metre. Enter rates from your own costing basis; there is no universal rate appropriate to every location and project.

Import rates

Use Import labor rates to load an Excel or CSV file, select the sheet and review the column mapping. Per-unit installation labor belongs here as well as hourly rates. Check the preview before updating matching catalog records.

Apply labor through an assembly

An hourly labor item needs hours per unit in the assembly. For example, a measured area multiplied by hours per area gives estimated labor hours; hours multiplied by the hourly rate gives labor cost.

BOQ trade defaults can provide a labor rate per hour or labor kind when the assembly has no override. Check which value is in use before pricing.

Review the estimate

In the quote, open Detailed estimating. Inspect labor hours, rate, labor cost and total cost beside the final quantity. The BOQ Order list also summarizes labor hours by trade.

Assemblies · Detailed estimating