Assemblies

Turn a measured quantity into reusable material and labor quote lines.

An assembly describes what one measured unit requires. For example, a roof area can produce covering, underlay and installation lines, each with its own quantity factor, waste and pricing basis.

Create an assembly

  1. Open Costing → Assemblies → Add assembly.
  2. Enter Assembly name and choose Per: the area, length, volume or count unit the assembly consumes.
  3. Set an optional Quote section.
  4. Enter Takeoff rows (one per line): the measurement labels this assembly applies to.
  5. Add quote lines and save with Add assembly or Save assembly.

Define each line

Set the line name, unit, Per unit factor and Waste %. Choose labor and material items from Costing or enter the offered prices. For hourly labor, enter hours per unit. A line can use the assembly's section or its own section.

The quantity follows: measured quantity × per-unit factor × (1 + waste). Check that input and output units match the conversion you intend. A quantity conversion and a selling price are different inputs.

Reuse and review

In a BOQ, use Swap assembly to choose a better match. Where offered, apply the choice to matching rows or save your assembly for future bills. Check generated quantities and costs after the change.

The assembly list offers edit, duplicate, pause/turn on and delete actions. A duplicate remains paused until you edit its takeoff-row matches. Deleting an assembly stops future exports from using it; quotes already exported keep their lines.

Import assemblies

Download Template from the Assemblies tab and follow its columns. Use Import to load the completed file, then review the resulting assemblies and their takeoff-label matches before using them in a live estimate.

Build a BOQ · Costing prices