Bills of quantities
Build a BOQ from takeoff rows, review assemblies and costs, then export an order list or quote.
A bill of quantities turns measured scope into the material and labor lines needed to price and order the work. Choose BOQ in the takeoff header, or open an existing bill from Bills of quantities.
Build from the drawing
Review the takeoff's counted rows, scale and run outcome first. Creating a BOQ cannot fill a gap in the underlying measurement evidence. A visible takeoff row excluded from totals is not automatically a usable BOQ quantity.
When the bill opens, check its version and the Rows built, Needs a look, material-cost and labor-cost summaries. Costs can continue filling in while lookup runs.
Review flagged rows
Choose Show only these to focus on rows needing attention. Inspect the measured quantity, selected assembly, generated material/labor lines and any missing costs. Use Swap assembly to choose from your own or standard assemblies.
Accept everything flagged confirms the flagged BOQ rows. Review them first. This BOQ check is separate from takeoff detections, which are saved without an Accept/Reject queue.
Fill costs and defaults
Use Find missing costs or Price again when appropriate, then inspect the returned prices and units. Set trade defaults for waste and labor only where they match your estimating practice. Assembly-specific values take precedence where indicated.
Export the result
- Download CSV exports the bill's rows.
- Order list groups materials to order and labor hours. Order quantities round up to whole units; BOQ costs use quantities before that order rounding. Rejected rows are omitted.
- Export to quote creates a quote for review and pricing.
- Update quote updates the linked quote; Export as new quote creates another one where offered.
Rebuild after measurement changes
Choose Rebuild to create a new BOQ version from the current takeoff. The previous version keeps its edits. Compare the changed quantities and assemblies before updating a linked quote.