66+ terms every contractor and estimator should know. Definitions for takeoff, bidding, BOQ, and contract concepts that show up on every commercial construction project.
This glossary covers the language of construction estimating: takeoffs, bills of quantities, bidding methods, contract types, payment instruments, and the cost concepts that drive every priced bid. Use it as a reference when reading specifications, pricing change orders, or onboarding a new estimator. Every term is cross-linked so you can follow the terminology from a high-level concept like a lump sum contract down to the unit prices, assemblies, and waste factors that build it up.
The glossary is maintained by the team at BuildVision AI, the AI-powered platform for construction takeoffs, BOQ generation, and quote and bid creation. If you spot a term that should be added, reach out and we will expand the glossary.
Black plastic pipe made from acrylonitrile butadiene styrene, used for drain, waste, and vent (DWV) plumbing lines and joined with one-step solvent cement.
A formal written modification to the bid documents issued during the bidding period that becomes part of the contract.
A dollar figure carried in the contract for a scope that has not yet been finalized, with a true-up at the time of selection.
A separate add or deduct price submitted alongside the base bid that gives the owner the option to include or exclude defined scope.
Drawings that show how a project was actually built, including every change, field adjustment, and relocated element that differs from the original design.
A pre-built grouping of materials, labor, and equipment for a complete installed unit, used to speed up estimating.
A surety bond submitted with a bid that guarantees the contractor will sign the contract at the bid price if awarded.
A formal, itemized document listing the quantities of every scope of work in a construction project, used as the basis for pricing and contract.
Abbreviation for bill of quantities — the itemized list of scope quantities and unit rates used to price and administer a construction contract.
Cubic feet per minute: the volume of air moved through a duct, fan, or diffuser each minute, the basic unit of airflow in US HVAC design.
A written modification to the original construction contract that changes the scope, schedule, or price.
An accessible fitting with a removable plug in a drain or sewer line that lets plumbers insert a cable or camera to clear blockages and inspect the pipe.
The complete set of drawings and specifications that define what will be built, used for permitting, bidding, and construction.
A reserve amount included in an estimate to cover unknown risks and unforeseen costs that arise during construction.
Cost per square foot is the total construction cost of a building divided by its floor area, used to compare projects, build early budgets, and sanity-check detailed estimates.
A pricing structure where the owner reimburses the contractor for actual costs plus an agreed fee, with no fixed total price.
The standard 50-division coding system used to organize construction specifications, estimates, and bills of quantities in North America.
A cubic yard is a unit of volume equal to a cube 3 feet long, 3 feet wide, and 3 feet deep — 27 cubic feet — and is the standard unit for ordering concrete, gravel, and fill.
A flat, straight-on view of a vertical surface such as an exterior facade or interior wall, showing heights, materials, openings, and finishes.
Electrical metallic tubing: a thin-wall, unthreaded steel raceway that protects and routes building wire, joined with set-screw or compression fittings.
A budget allowance for the increase in material and labor costs between the date of the estimate and the date the work is performed.
The total cost of an employee beyond base wages — taxes, insurance, benefits, and other employer costs — expressed as a percentage of wages.
A signed document in which the contractor or supplier waives the right to file a mechanics lien for the amount paid.
A linear foot is a straight-line measurement of 12 inches of length, used to quantify items like pipe, conduit, trim, curb, and wall runs regardless of their width or height.
A wall that carries weight from the structure above, such as the roof, floors, or other walls, and transfers it down to the foundation.
A fixed total price for a defined scope of work, with the contractor absorbing the risk of cost overruns within that scope.
A U-shaped section of drain pipe below a fixture that holds a water seal to block sewer gas from entering the building while letting wastewater drain.
The monthly invoice document the contractor submits to the owner requesting a progress payment for completed work.
A surety bond that guarantees the contractor will complete the contracted work according to the terms of the contract.
A placeholder cost figure inserted in an estimate when actual pricing is not yet available, intended to be replaced before bid submission.
The minimum hourly wage and fringe benefit rate that contractors must pay workers on certain government-funded construction projects.
A periodic payment from the owner to the contractor for work completed during a billing period, based on the schedule of values.
A punch list is a document listing the incomplete, damaged, or non-conforming work that must be corrected near the end of a construction project before final completion and payment.
US rebar is sized by bar number, where #3 through #8 equal the nominal diameter in eighths of an inch, so a #4 bar is 1/2 inch and a #5 bar is 5/8 inch.
A ceiling plan drawn as if reflected in a mirror on the floor, showing ceiling types, heights, grid layout, light fixtures, diffusers, and other ceiling-mounted items.
A percentage of each progress payment the owner withholds from the contractor as security until project completion.
A formal written question from the contractor to the design team during construction asking for clarification of the documents.
A formal solicitation from an owner asking contractors to submit qualifications, approach, and price for a construction project.
A formal request from the owner asking contractors to submit qualifications (or pricing) for a project or scope.
Romex is the common brand name for NM-B nonmetallic-sheathed cable: insulated conductors and a bare ground inside a plastic jacket, used for branch circuits in wood-frame buildings.
A rough order of magnitude (ROM) estimate is an early, low-detail cost estimate prepared with minimal design information to tell an owner whether a project is in the right financial range.
The widely used construction cost database that publishes unit prices for thousands of construction work items, updated annually.
A breakdown of the contract sum into line items that defines how progress payments will be calculated.
Detailed drawings prepared by a contractor, subcontractor, fabricator, or supplier that show exactly how a component will be fabricated and installed.
A top-down drawing of an entire property that shows the building footprint, property lines, setbacks, parking, utilities, grading, and landscaping.
A concrete floor slab placed directly on the prepared ground, supported by the soil below rather than by beams or walls, typically 4 inches thick or more.
Project costs that are not tied directly to physical construction — design fees, permits, financing, legal, insurance, and other indirects.
The center-to-center distance between vertical studs in a framed wall, most commonly 16 inches on center, with 24 inches on center also widely used.
A submittal is a document or sample — such as shop drawings, product data, or material samples — that a contractor sends to the architect or engineer for review to confirm it meets the design before the item is fabricated or installed.
The process of measuring and counting items from construction drawings to determine the materials and labor needed for a project.
A single-conductor building wire with thermoplastic insulation and a nylon jacket, rated 90°C in dry locations and pulled through conduit in commercial work.
A billing structure where the contractor is paid hourly labor billing rates plus material cost with markup, with no fixed total.
Value engineering (VE) is a structured review of a project’s design, materials, and methods to deliver the required function at a lower total cost without sacrificing performance or quality.
A variable air volume terminal unit that uses a motorized damper to vary the airflow delivered to a zone in response to its thermostat, often with a reheat coil.