BuildVision AIBuildVision AI

For electricians

Electrical Estimating & Takeoff Software

BuildVision reads the symbol legend on your electrical plans, counts the receptacles, switches and fixtures it defines, measures the branch wiring it can prove, and puts every count on the drawing for you to check before it becomes a priced quote.

E-101 first floor lighting plan from the Maple Street Residence demo set, measured in the BuildVision takeoff editor.
The BuildVision takeoff editor on sheet E-101, the first floor lighting plan of our Maple Street Residence demo set. Every fixture and switch is counted and marked on the sheet; E-102 carries the power plan. Click a row to see its symbols.

What the AI takes off for electrical

There is no fixed catalog of electrical devices inside BuildVision. The takeoff starts from your drawing: the agent reads the sheet legend, learns each symbol the engineer drew there, and counts every match on the plan under the legend’s own name. A “WP GFCI duplex” on your legend comes back as a WP GFCI duplex, not as a generic outlet.

Here is what the electrical takeoff covers today, and what you still do by hand. “AI” means the agent produces the row; “Manual” means you draw or count it with the editor’s count, linear and area tools.

Devices and fixtures

  • Receptacles AI

    Duplex, quad, GFCI and weatherproof variants, including a legend row that lists several variants and a combined WP + GFCI marker beside the device.

  • Switches AI

    Switch symbols drawn as the S glyph, with the qualifiers your legend defines (3-way, dimmer, and so on).

  • Lighting fixtures by tag AI

    Fixture tags on the plan (A1, B, C…) checked against the fixture schedule, including troffers, panels and downlights.

  • Emergency fixtures AI

    Dual-head and battery units, and emergency fixture codes taken from the schedule.

  • TV and data outlets AI

    The triangle symbols most legends use for TV and data.

  • Any other legend symbol AI

    Other symbols defined in the legend are matched against the legend glyph. Lower-confidence matches arrive as pending rows for you to accept or reject.

Schedules, panels and circuits

  • Panel schedules AI

    Panels and equipment counted from the panel schedule (EA).

  • Equipment connections AI

    Rows from an equipment connection schedule (tag, circuit, disconnect) when each tag appears once on the plan.

  • Circuit tags AI

    Printed circuit tags such as RP5-14 set the circuit count and the home run to the labeled panel.

  • One-line and riser diagrams AI

    Diagram-only sheets are recognized so their schematic symbols are not counted as installed devices.

Lengths

  • Drawn branch wiring AI

    Curved, dashed circuit runs drawn in a vector PDF are measured in LF. This is the drawn length the agent can prove, not the full installed cable.

  • Conduit / branch wiring estimate AI

    On sheets with six or more devices, a route is estimated from the device layout (drawn length plus an 18% span allowance). Fixtures per circuit and home-run allowance are settings, and you can recalculate after edits.

  • Straight or solid runs, scanned sheets Manual

    Straight runs, solid linework and raster-only pages are outside the wiring reader. Trace them with the linear tool.

  • Conductor count, wire size, feeders Manual

    The takeoff does not infer how many conductors are in a run or their gauge. Set those in your BOQ lines from the panel schedule.

Everything above lands as rows on the sheet: a colored mark on each symbol and a line on each run. You can open any row, hide it, recolor it, or delete a false hit. Symbols the legend never defines, and devices on a page where the agent is not sure, are the ones to count by hand or confirm.

Worked example: Maple Street lighting and power plans

This is the takeoff the editor above shows, from two sheets of the Maple Street Residence demo set: E-101, the first floor lighting plan, and E-102, the power plan. Between them they hold 61 counted devices and two branch wiring runs measured on the sheets: 211.78 LF on E-101 and 274.23 LF on E-102, 486.01 LF in all.

The counts come straight from the drawing. The unit prices in the quote table are placeholders so the arithmetic is visible; in BuildVision they come from your own price list, and the BOQ recipes split each device into the device, box, ring and plate lines you price.

E-101 first floor lighting plan, Maple Street Residence demo set
Sheet E-101, first floor lighting plan, Maple Street Residence demo set (synthetic).
Step 1. Device counts by symbol (E-101 and E-102)
SymbolSheetCount
Duplex receptacleE-102× 21
GFCI receptacleE-102× 9
Single-pole switchE-101× 7
3-way switchE-101× 2
Recessed LED can lightE-101× 8
Surface-mounted light fixtureE-101× 5
Linear LED strip lightE-101× 4
Ceiling exhaust fanE-101× 1
Smoke detectorE-101× 3
Electrical panelE-102× 1
Devices61
Step 2. Lengths measured on the sheets
RowSheetQuantity
Branch circuit wiringE-101211.78 LF
Branch circuit wiringE-102274.23 LF
Total drawn branch wiring486.01 LF
Step 3. BOQ lines priced into a quote (example unit prices)
BOQ lineQtyUnit priceAmount
Duplex receptacle21 EA$55.00$1,155.00
GFCI receptacle9 EA$85.00$765.00
Single-pole switch7 EA$45.00$315.00
3-way switch2 EA$65.00$130.00
Recessed LED can light8 EA$95.00$760.00
Surface-mounted light fixture5 EA$110.00$550.00
Linear LED strip light4 EA$120.00$480.00
Ceiling exhaust fan1 EA$180.00$180.00
Smoke detector3 EA$90.00$270.00
Electrical panel1 EA$650.00$650.00
Branch circuit wiring, installed486.01 LF$3.50$1,701.03
Subtotal$6,956.04
Overhead and profit at 15%$1,043.41
Quote total$7,999.44

Read the wiring figure for what it is. 486.01 LF is the run drawn on the two plans. Before you price conductors, add your drops from ceiling to device height, the home runs to the panel and slack at boxes, and multiply by the conductors in each run. BuildVision’s electrical recipes assume one 20 A circuit (three #12 THHN) in branch conduit up to 3/4 in; change that where your job differs.

Long home runs also need a voltage drop check. On a 120 V single-phase circuit, drop is 2 × I × R × L / 1,000, with R for 12 AWG copper at 1.98 ohms per 1,000 ft (NEC Chapter 9, Table 8). At a full 20 A that reaches 3% at about 45 ft one-way, so measure your longest run on the plan with the linear tool and upsize the wire if it is over.

How an electrical takeoff runs in BuildVision

Six steps from the plan set to a quote. The review step is real work: the agent is fast, but you still own the number you send.

  1. 1

    Upload the set

    Drop in the PDF plan set, or a ZIP of PDFs. The scale printed on each sheet is detected for you to confirm, pick another or type in.

  2. 2

    Agent takeoff

    The agent reads each legend and fixture schedule, counts symbols across the lighting, power and systems sheets, reads panel schedules and measures the branch wiring it can prove.

  3. 3

    Review on the drawing

    Every row is marked on the sheet. Matches the agent is unsure of come in as pending rows you accept or reject. Spot-check the busiest rooms, then count anything the legend did not define.

  4. 4

    Build the BOQ

    Reviewed rows become bill of quantities lines through the CSI 26 recipes: device, box, plate and breaker share for each device, and conduit with conductors for each run. Your prices, your waste factors.

  5. 5

    Send the quote

    Push the BOQ into an editable quote, add exclusions and allowances, and send a share link or a PDF.

  6. 6

    Export

    Take the takeoff and BOQ out as Excel, CSV or PDF, or an annotated PDF with every count marked on the sheet for the GC or your field lead.

What it costs an electrical contractor

$299 per seat per month with unlimited takeoffs, or $2,990 per seat per year. 14-day free trial · Card required. Each estimator needs a seat; takeoffs are unlimited, so a busy month costs the same as a slow one. An electrical package is usually the lighting, power and systems sheets plus panel schedules, so think in those pages, not the whole set.

One or two electricians bidding residential and small tenant work

One seat, $299/month

One estimator, unlimited takeoffs. The 14-day free trial shows whether it fits before you pay.

A shop with a dedicated estimator bidding commercial work every week

A seat per estimator

Every estimator gets a seat at $299/month, or $2,990/year. Volume does not change the price, so weekly bidding costs the same as occasional bidding.

An estimating department running large sets or several estimators

Several seats, talk to sales

Large sets and several estimators need shared libraries, rates and review steps. Talk to sales and we set that up with your team.

Teams that want their trades, symbols, rates and quote layout set up with them before the first live bid can try it free or talk to sales.

Electrical estimating tools compared

Electrical estimating software splits into two jobs: takeoff (counting and measuring from drawings) and estimating (a parts database with labor units and supplier pricing). Some products do both, some pair with a separate takeoff tool. The facts below are only what each vendor publishes on its own site, checked on 5 November 2026.

ToolWhat it isWorks fromPublished pricingTrial
CountfirePDF takeoff for electrical, lighting, fire, security and data. The vendor says its AI counts symbols across every drawing and names items as it counts.PDF drawingsNot published (pricing page goes to contact form)Trial offered; length not published
Trimble Accubid AnywhereCloud estimating for electrical and industrial mechanical contractors, with graphical takeoff, drawing comparison, LiveCount AI and Auto Count.Drawings (file types not published)Quote onlyNot published
McCormick SystemsDatabase-driven estimating and takeoff for electrical, plumbing and mechanical, with NECA labor units, auto-count and Auto Home Run.On-screen takeoff on drawingsNot published (request a demo)Not published
ConEst IntelliBidElectrical, low voltage, datacom and solar estimating with a large item database and NEC assemblies. Takeoff counts come from the separate SureCount product.Drawings via SureCountNot published (Standard, Plus and Pro editions named)Not published (demo)
PlanSwiftGeneral takeoff and estimating for all trades; lists electrical layout counts and an Auto Count tool that finds matches of a symbol you point at.PDF, image and CAD plan filesEssential $2,000/yr, Core $3,000/yr, one seat each14 days, free, card not required

Where BuildVision differs: the agent starts the takeoff on its own from the legend instead of waiting for you to click a sample symbol, the review happens on the drawing, and the same project carries the BOQ, the quote and the share link. It is not a NECA labor-unit database or a supplier price feed; if your shop prices from Accubid, McCormick or ConEst, you can still export BuildVision counts to Excel or CSV and price them there.

Electrical estimating and takeoff FAQs

What is the best electrical estimating software?

It depends on where your hours go. If counting devices and measuring runs takes most of the time, pick a tool that automates the takeoff and lets you check it on the drawing. If you already have counts and need NECA labor units and supplier pricing, a database estimating system fits. Run the same plan set through two or three trials and compare the counts you would actually bid.

How do electricians estimate a job?

Count every device and fixture by type from the plans, measure conduit and wire runs including home runs, apply labor units per device and per foot, price material from your supplier, then add overhead, profit, permits and exclusions. Most mistakes come from missed symbols and short wire runs, which is why the count needs to be checked against the drawing.

What is a takeoff in electrical estimating?

An electrical takeoff is the list of quantities on the drawings: receptacles, switches and fixtures by type (EA), conduit and wire by size (LF), panels and equipment. It comes before pricing. The estimate applies labor and material costs to those quantities.

Can AI count electrical symbols from a PDF?

Yes, when the PDF has a legend that defines the symbols. BuildVision reads the legend and counts matches on each plan, and uncertain matches come in as pending rows for you to accept or reject. Symbols the legend never defines, and scanned sheets, still need a manual count.

Does BuildVision calculate wire lengths?

It measures drawn curved, dashed branch wiring in vector PDFs and estimates a conduit or branch wiring route from the device layout on sheets with six or more devices. Neither is the full installed cable: add drops, home runs and slack, and set conductor count and gauge in your BOQ.

Can I bid and quote electrical jobs from the same software?

Yes. The reviewed takeoff becomes a priced BOQ, and the BOQ becomes an editable quote in the same project: add exclusions and allowances, then send a share link or a PDF. If you price bids in another estimating system, export the counts to Excel or CSV instead.

Can I get an electrical takeoff done for me?

Not as a standalone service. BuildVision is software your own estimators run. We set it up with your team, with your symbols, rates and quote layout, and train your estimators, so the takeoff stays in house.

Can I use my own prices and labor rates?

Yes. The BOQ recipes turn each counted device into material and labor lines, and you set the unit prices, labor hours and waste factors. The example prices on this page are only there to show the arithmetic.

What file formats can I export?

Excel, CSV and PDF, plus an annotated PDF that shows each counted symbol and measured run on the sheet. Quotes can be sent as a share link or a PDF.

Can I try it before I pay?

Yes. 14-day free trial · Card required. Run your own bids end to end. After that it is $299 per seat per month with unlimited takeoffs. If you want help setting it up for your team, talk to sales.

Run your next electrical takeoff on your own plans

Upload a plan set, review what the agent counted and measured on the drawing, and send the quote.

14-day free trial · Card required · $299/seat/month after

Electrical Estimating & Takeoff Software | BuildVision AI