Free Construction Labor Calculator

Labor Cost Calculator

Price construction labor from crew size, hours or production rates, wages, and labor burden. Add overhead and markup to get the labor price for your bid.

Crew Labor Cost Calculator

Get crew hours from the schedule or from a quantity and production rate, then load each role with burden.

Calculator inputs

Schedule method.

Schedule method.

Productivity method, e.g. sq ft of drywall or linear ft of wall.

Productivity method. Use your own job-cost history.

6.0% less up to 5.4% state credit, on the first $7,000 per employee per year (IRS).

Your company overhead recovery, as a percent of loaded labor.

Applied to loaded labor plus overhead.

Crew

Item 1

Planning estimate only. Confirm field measurements, product coverage, local requirements, waste, pricing, and supplier quantities before ordering or bidding.

How to Calculate Construction Labor Cost

Crew-hours = quantity / units per crew-hour

Crew-hours (schedule mode) = days x hours per day

Labor hours = crew-hours x headcount x share of hours

Burden rate = FICA + FUTA + SUTA + workers comp + liability + downtime

Loaded rate = wage x (1 + burden rate)

Labor cost = loaded rate x labor hours

Labor price = labor cost x (1 + overhead) x (1 + markup)

Worked example: hanging 4,800 sq ft of drywall

Switch the calculator to Productivity, enter 4,800 sq ft and a production rate of 120 sq ft per crew-hour (an example rate; use your own job history), and set the crew to 2 hangers at $28 per hour.

StepMathResult
Crew-hours4,800 / 12040 hrs
Labor hours40 x 2 hangers80 hrs
Burden rate6.2 + 1.45 + 0.6 + 3 + 0.4 (liability $4 per $1,000) + 15 (workers comp) + 5 (downtime)31.65%
Loaded rate$28 x 1.3165$36.86 / hr
Labor cost$36.862 x 80$2,948.96
Overhead at 10%$2,948.96 x 0.10$294.90
Markup at 15%($2,948.96 + $294.90) x 0.15$486.58
Labor price$3,243.86 + $486.58$3,730.43

The 3% state unemployment and 15% workers compensation rates are the calculator's editable defaults, not typical rates. Replace them with the rates on your state notice and your policy.

Labor Burden Components

Labor burden is everything you pay on top of the base wage for each hour worked. The statutory taxes are fixed by law; the rest depends on your state, your trade, your claims history, and the benefits you offer.

ComponentHow it is chargedSource
Social Security (FICA)6.2% of wages, employer share, up to the annual wage base ($184,500 in 2026)SSA contribution and benefit base
Medicare (FICA)1.45% of all wages, employer share, no wage capSSA contribution and benefit base
Federal unemployment (FUTA)6.0% of the first $7,000 per employee per year; 0.6% after the maximum 5.4% state creditIRS Topic no. 759
State unemployment (SUTA)Set by each state from your claims history, on a state wage base; your state sends your rate each yearU.S. DOL unemployment insurance tax topic
Workers compensationPriced per $100 of payroll by job class code and state, adjusted by your experience modifier; varies more than any other lineYour policy or state rating bureau
General liabilityOften rated on payroll or revenue; the calculator takes dollars per $1,000 of payroll from your policyYour policy
Benefits and paid leaveHealth insurance, retirement contributions, holidays, and vacation you pay for hours not worked on the jobBLS ECEC (table below)

What construction employers pay per hour worked

The Bureau of Labor Statistics measures what private construction employers spend per hour worked. In June 2026, benefits added $15.84 to $36.13 of wages, equal to 43.8% of wages. Legally required benefits (Social Security, Medicare, unemployment insurance, and workers compensation) were 12.2% of wages on average across the industry.

Construction industry, private employers, cost per hour worked, June 2026. Source: BLS Employer Costs for Employee Compensation, Table 4. Share of wages is calculated from the BLS dollar figures.
ItemCost per hourShare of total compensationShare of wages
Wages and salaries$36.1369.5%—
Paid leave$2.635.1%7.3%
Supplemental pay$2.494.8%6.9%
Insurance$3.907.5%10.8%
Retirement and savings$2.394.6%6.6%
Legally required benefits$4.428.5%12.2%
Total benefits$15.8430.5%43.8%
Total compensation$51.96100%143.8%

These are industry averages across all construction employers, union and open shop. Your own burden can be well above or below them; build it from your payroll records and policies.

Productivity Units by Trade

Productivity mode turns a takeoff quantity into crew-hours. Measure production in the same unit as the takeoff line, and take the rate from your closed jobs: actual quantity installed divided by actual crew-hours booked.

TradeProduction unit
Drywall hanging and finishingsq ft of board per crew-hour
Wall framinglinear ft of wall per crew-hour
Concrete placing and finishingsq ft of slab or cu yd placed per crew-hour
Roofingsquares (100 sq ft) per crew-hour
Paintingsq ft of surface per crew-hour, per coat
Masonryblocks or bricks laid per crew-hour
Electrical and plumbing rough-indevices, fixtures, or openings per crew-hour

Need the hourly rate to bill rather than the cost of a crew? Use the hourly rate calculator. To convert a target margin into a markup, use the markup calculator.

Automate takeoff, labor pricing, and quote creation.

Get more quotes out with less time transferring quantities and recalculating labor costs. BuildVision extracts quantities from your plans, applies your labor allowances, burdened rates, and material costs, and creates a branded quote. Your team reviews the final numbers. Try it free on your own plans.

Other Construction Calculators

Explore our full suite of free construction calculators

How the Labor Calculator Works

Labor cost is hours times a loaded rate, and both halves carry assumptions. Hours come from the schedule (days x hours per day) or from productivity (takeoff quantity / units per crew-hour). The loaded rate is the base wage plus labor burden: payroll taxes, unemployment insurance, workers compensation, liability insurance, and an allowance for paid time that is not productive on the job.

Enter each crew role with its headcount and wage, choose how hours are set, and replace the burden defaults with your own rates. The result shows crew-hours, labor hours, the burden rate, the loaded hourly rate per role, total labor cost, and the labor price after overhead and markup.

Crew cost build-up

  • Crew-hours = quantity / units per crew-hour, or days x hours per day
  • Labor hours = crew-hours x headcount x share of hours
  • Loaded rate = wage x (1 + burden rate)
  • Labor cost = loaded rate x labor hours
  • Labor price = labor cost x (1 + overhead) x (1 + markup)

Estimating Steps and Checks

1

Set how hours are counted

Use schedule mode when you know how long the crew is on site. Use productivity mode when you have a takeoff quantity and a production rate from your own closed jobs.

2

Build the crew

Add one row per role with headcount and base wage. Foreman, journeyman, apprentice, and laborer are different costs, so price them separately. Lower the share of hours for roles that are only on site part of the time.

3

Replace the burden defaults

Social Security and Medicare are set by law. Take the state unemployment rate from your state notice, workers compensation from your policy by class code, and liability from your policy.

4

Add overhead and markup

Overhead recovers company costs that are not in the job. Markup is applied to labor cost plus overhead. Use the markup calculator to convert a target margin into a markup first.

Common Checks

  • Bid with loaded labor, not bare wages. In June 2026 BLS data, construction employers paid benefits equal to 43.8 percent of wages on average.
  • Social Security stops at the annual wage base ($184,500 in 2026) and FUTA applies only to the first $7,000 per employee, so the burden on long jobs for high earners is lower than the full rate suggests.
  • Workers compensation is priced by class code; one crew can carry several rates. Use the rate for the work each role actually does.
  • Compare estimated and actual crew-hours on every closed job and update your production rates.

Labor Calculator FAQs

How do I calculate labor cost for a construction job?

Find crew-hours (quantity divided by units per crew-hour, or days times hours per day), multiply by headcount for labor hours, then multiply by the loaded hourly rate. Example: 4,800 sq ft of drywall at 120 sq ft per crew-hour is 40 crew-hours; with 2 hangers that is 80 labor hours; at a $36.86 loaded rate that is $2,948.96.

What is labor burden?

Labor burden is what you pay on top of the base wage for each hour: employer Social Security (6.2 percent up to the wage base) and Medicare (1.45 percent), federal and state unemployment, workers compensation, liability insurance, and benefits such as health insurance, retirement, and paid leave. The burden rate is that total divided by wages.

What labor burden percentage should I use?

Build it from your own payroll and policies. As a reference, BLS Employer Costs for Employee Compensation shows construction employers paid $15.84 per hour in benefits on $36.13 of wages in June 2026, or 43.8 percent of wages, of which legally required benefits were $4.42 (12.2 percent of wages). Your rate depends on your state, trade, claims history, and benefits.

How is FUTA calculated for construction workers?

FUTA is 6.0 percent of the first $7,000 paid to each employee in a year. Employers that qualify for the full 5.4 percent credit for state unemployment taxes pay 0.6 percent, or at most $42 per employee per year (IRS Topic 759).

What is a production rate?

A production rate is the quantity a crew installs per crew-hour, in the same unit as the takeoff: square feet of drywall, linear feet of wall, squares of roofing. Calculate it from closed jobs as installed quantity divided by actual crew-hours.

Should overhead go in the labor rate or a separate line?

In a bid, either works if every hour recovers its share. For job costing, keep direct labor and overhead separate so you can tell whether a missed margin came from field hours or from office costs.

What is the difference between this and the hourly rate calculator?

This calculator prices the labor on one job from crew, hours, and burden. The hourly rate calculator works out a billing rate from annual company costs, billable hours, and profit.

Try it on your own plans

Automate takeoff, labor pricing, and quote creation.

Get more quotes out with less time transferring quantities and recalculating labor costs. BuildVision extracts quantities from your plans, applies your labor allowances, burdened rates, and material costs, and creates a branded quote. Your team reviews the final numbers. Try it free on your own plans.

First takeoff free · No card · $299/seat/month after

Labor Cost Calculator | Crew Cost, Burden & Labor Rate