Construction Calculators
Jump to a tool or explore below.
Roof Pitch Calculator
Enter rise and run, an angle, or a slope percent. Get the pitch in x/12, degrees, percent, the pitch multiplier, and rafter length, with code and safety thresholds flagged.
Roof Pitch Calculator
Choose how you measured the slope, fill in that value, and add the building span for rafter length
Roof Pitch to Degrees and Multiplier, 1/12 to 24/12
Every whole pitch from 1/12 to 24/12 with its angle, the pitch multiplier (roof area or rafter length per unit of horizontal run), and the hip/valley factor (hip or valley length per unit of common run where both planes share the pitch). For slope percent, rafter length per foot, and typical uses of each pitch, see the roof pitch chart.
| Pitch | Degrees | Pitch multiplier | Hip/valley factor |
|---|---|---|---|
| 1/12 | 4.76° | 1.003 | 1.417 |
| 2/12 | 9.46° | 1.014 | 1.424 |
| 3/12 | 14.04° | 1.031 | 1.436 |
| 4/12 | 18.43° | 1.054 | 1.453 |
| 5/12 | 22.62° | 1.083 | 1.474 |
| 6/12 | 26.57° | 1.118 | 1.500 |
| 7/12 | 30.26° | 1.158 | 1.530 |
| 8/12 | 33.69° | 1.202 | 1.563 |
| 9/12 | 36.87° | 1.250 | 1.601 |
| 10/12 | 39.81° | 1.302 | 1.641 |
| 11/12 | 42.51° | 1.357 | 1.685 |
| 12/12 | 45.00° | 1.414 | 1.732 |
| 13/12 | 47.29° | 1.474 | 1.781 |
| 14/12 | 49.40° | 1.537 | 1.833 |
| 15/12 | 51.34° | 1.601 | 1.887 |
| 16/12 | 53.13° | 1.667 | 1.944 |
| 17/12 | 54.78° | 1.734 | 2.002 |
| 18/12 | 56.31° | 1.803 | 2.062 |
| 19/12 | 57.72° | 1.873 | 2.123 |
| 20/12 | 59.04° | 1.944 | 2.186 |
| 21/12 | 60.26° | 2.016 | 2.250 |
| 22/12 | 61.39° | 2.088 | 2.315 |
| 23/12 | 62.45° | 2.162 | 2.382 |
| 24/12 | 63.43° | 2.236 | 2.449 |
Worked Examples
From rise and run
9 in of rise over a 16 in run: 9 × 12 / 16 = 6.75, so 6.75/12 (nearest whole pitch 7/12). Angle arctan(9/16) = 29.36°, slope 56.25%, multiplier 1.147. On a 28 ft span the common rafter is 14 × 1.147 = 16.06 ft.
From an angle
A digital level reads 30°. Rise per 12 = 12 × tan(30°) = 6.93, so the roof is 6.93/12, just under 7/12. Slope 57.7%, multiplier 1.155.
From a percent
A drawing shows a 25% slope. Rise per 12 = 0.25 × 12 = 3, a 3/12 pitch at 14.04°. That is between 2/12 and 4/12, so shingles need double underlayment under IRC R905.2.2.
How to Measure Roof Pitch
From the attic
- Find a common rafter, not a hip or valley rafter, in a section that is not sagging.
- Hold a level against the underside of the rafter, bubble centered, one end touching the rafter.
- Mark 12 inches along the level from that end.
- Measure straight up or down from the mark to the rafter. That distance in inches is the rise per 12: 6 inches means 6/12.
On the roof with a level
- Only do this with fall protection appropriate to the roof; see the thresholds below.
- Rest one end of a 24 in level on the roof surface and hold it level, pointing uphill-to-downhill.
- Measure from the 12 in mark down to the roof. With a 24 in level you can also measure at the far end and halve it.
- Take readings on two or three courses and average them; curled shingles add error.
From the gable end or the plans
Measure the total rise from the top of the wall plate to the ridge and the run from the outside of the wall to the ridge centerline (half the span). Enter both as rise and run in the calculator: an 8 ft rise over a 16 ft run is 6/12. On drawings, the pitch symbol on the elevation (a small triangle with 12 on the long side) gives it directly.
Pitch Thresholds: Shingles and Walkability
| Pitch | Asphalt shingles (IRC R905.2.2) | OSHA 1926.500 class |
|---|---|---|
| Under 2/12 | Not permitted; use a low-slope covering | Low-slope roof |
| 2/12 to under 4/12 | Permitted with double underlayment | Low-slope roof |
| Exactly 4/12 | Permitted, standard underlayment | Low-slope roof (4 in 12 or less) |
| Over 4/12 | Permitted, standard underlayment | Steep roof |
Sources: IRC Section R905.2.2 (2021 International Residential Code) limits asphalt shingles to slopes of 2 units vertical in 12 horizontal or greater and requires double underlayment from 2/12 up to 4/12. OSHA 29 CFR 1926.500(b) defines a low-slope roof as 4 in 12 or less and a steep roof as greater than 4 in 12. Local amendments and the shingle manufacturer's instructions can be stricter.
Walkable pitch: no code sets a walkable pitch, and OSHA fall-protection rules for construction work apply on both classes once the edge is 6 ft or more above a lower level. Many crews walk roofs up to roughly 6/12 or 7/12 when dry and set roof jacks, toe boards, or harnesses beyond that. Treat any wet, frosty, or dusty roof as steeper than its number.
Automate your roofing takeoffs and quotes.
Go beyond checking the pitch. Get more roofing quotes out with less manual takeoff and repeated pricing work. BuildVision extracts roof areas and lengths from your plans and carries them through your rates and assemblies into a branded quote. Your team checks the quantities and pricing before sending. Try it free on your own plans.
How the Roof Pitch Calculator Works
Roof pitch is the rise in inches for every 12 inches of horizontal run, written x/12. Enter what you have, either a measured rise and run, an angle in degrees from a plan or a digital level, or a slope percent from a drainage drawing, and the calculator returns the same slope in every form: x/12 pitch, degrees, percent, the pitch multiplier that converts footprint to roof area, rafter length per foot of run, and the full rafter length for a building span.
Worked example: a rafter rises 9 inches over a 16-inch run. Normalized to 12 inches, the rise is 9 x 12 / 16 = 6.75, so the pitch is 6.75/12 (nearest whole pitch 7/12). The angle is arctan(9 / 16) = 29.36 degrees, the slope is 56.25 percent, and the pitch multiplier is sqrt(1 + 0.5625^2) = 1.147. On a 28 ft building span the common rafter is 14 x 1.147 = 16.06 ft from the wall line to the ridge centerline, before the ridge board deduction and the overhang.
The calculator also flags the two thresholds that change a roofing job. Under IRC R905.2.2, asphalt shingles need at least a 2/12 slope, with double underlayment from 2/12 up to 4/12. Under OSHA 29 CFR 1926.500, a roof over 4 in 12 is a steep roof for fall-protection purposes.
Roof pitch formulas
- Pitch (x/12) = rise / run x 12
- Angle (degrees) = arctan(rise / run)
- Rise per 12 from an angle = 12 x tan(angle)
- Slope % = rise / run x 100
- Pitch multiplier = sqrt(1 + (rise / run)^2)
- Common rafter length = (span / 2) x pitch multiplier
- Hip or valley length = common run x sqrt(pitch^2 + 288) / 12 (equal-pitch planes)
Estimating Steps and Checks
Measure rise over a known run
From the attic, hold a level against the underside of a common rafter, mark 12 inches along the level, and measure straight down to the rafter. Outside, rest a level on the shingles or a rake board and do the same. Any run works if you enter both numbers; the calculator normalizes to 12.
Or enter an angle or a percent
Switch the input to Angle for a reading from a digital level, a plan elevation, or a drone report, or to Slope percent for engineering drawings. A 50 percent slope and a 26.57 degree angle both return 6/12.
Add the span for rafter length
Enter the full building span to get the common rafter from wall line to ridge centerline. Add the horizontal overhang to extend the rafter along the slope. Deduct half the ridge board thickness and lay out the plumb and seat cuts on the stock.
Use the multiplier for material
Multiply footprint area by the pitch multiplier to get roof area, then carry that into the roofing square or shingle calculator. Check the shingle slope flag before pricing a low-slope roof.
Common Checks
- Angle check: 12/12 is exactly 45 degrees. Anything under 45 degrees is less than 12/12, and degrees are not pitch divided by 12: 4/12 is 18.43 degrees.
- Normalization check: if you measured over a 24-inch level, the pitch is half the measured drop. A 10-inch drop over 24 inches is 5/12.
- Code check: IRC R905.2.2 sets a 2/12 minimum for asphalt shingles and requires double underlayment from 2/12 up to 4/12. Below 2/12, plan a low-slope membrane or another covering the code allows.
- Measuring check: measure on a common rafter, not a hip, valley, or a sagging section. Readings taken on top of curled shingles can be off by a fraction of a pitch.
Roof Pitch Calculator FAQs
What is a 4/12 pitch in degrees?
A 4/12 pitch is 18.43 degrees: arctan(4 / 12) = 18.43. It is a 33.3 percent slope with a pitch multiplier of 1.054, so a 4/12 roof has about 5.4 percent more surface than its footprint.
What is a 6/12 pitch in degrees?
A 6/12 pitch is 26.57 degrees, a 50 percent slope, with a pitch multiplier of 1.118. A 6/12 rafter is 13.42 inches long for every 12 inches of horizontal run.
How do I calculate roof pitch?
Measure the vertical rise over a known horizontal run and multiply the ratio by 12. If the roof rises 8 inches over 16 inches, the pitch is 8 / 16 x 12 = 6, a 6/12 pitch. If you know the total rise and the half span, use those: an 8 ft rise over a 16 ft run is also 6/12.
What roof pitch is walkable?
No code defines a walkable pitch. OSHA 29 CFR 1926.500 classes roofs of 4/12 or less as low-slope and anything over 4/12 as a steep roof, and fall protection rules apply on both at 6 ft or more above a lower level in construction work. In practice, many crews walk up to roughly 6/12 to 7/12 in dry conditions and use roof jacks, toe boards, or harnesses beyond that. Surface, weather, and footwear matter as much as the number.
What is the minimum roof pitch for asphalt shingles?
Under IRC R905.2.2 (2021 International Residential Code), asphalt shingles may only be used on slopes of 2/12 or greater. From 2/12 up to 4/12, the code requires double underlayment. Manufacturers can be stricter, so check the installation instructions on the bundle.
How do I convert roof pitch to degrees?
Divide the rise by 12 and take the inverse tangent: degrees = arctan(rise / 12). On a phone calculator, make sure it is in degree mode. 3/12 is 14.04 degrees, 8/12 is 33.69 degrees, 10/12 is 39.81 degrees, and 12/12 is 45 degrees.
How do I convert degrees to roof pitch?
Multiply the tangent of the angle by 12. A 30 degree roof is tan(30) x 12 = 6.93, so it is just under a 7/12 pitch. A 35 degree roof is 8.40/12.
What is a pitch multiplier?
The pitch multiplier, also called the slope factor, is the ratio of sloped roof length to horizontal run: sqrt(1 + (rise / 12)^2). Multiply a footprint area by it to get roof area, or a horizontal run by it to get rafter length. It is 1.054 at 4/12, 1.118 at 6/12, 1.202 at 8/12, and 1.414 at 12/12.
Is roof slope the same as roof pitch?
In everyday roofing they are used the same way, both written as rise per 12 of run. In older carpentry texts, pitch meant rise divided by the full span, so a 6/12 slope on a symmetrical gable was a 1/4 pitch. This calculator uses the common x/12 meaning.
Estimating Software by Trade
Related Tools & Resources
Turn Calculator Work Into Bids
Estimating Software
Related Calculators
Software Comparisons
From the Blog
Try it on your own plans
Automate your roofing takeoffs and quotes.
Go beyond checking the pitch. Get more roofing quotes out with less manual takeoff and repeated pricing work. BuildVision extracts roof areas and lengths from your plans and carries them through your rates and assemblies into a branded quote. Your team checks the quantities and pricing before sending. Try it free on your own plans.
First takeoff free · No card · $299/seat/month after