Mechanical Estimating Software That Actually Works

Prepare mechanical takeoffs from PDF plans. Measure and count, review quantities, and turn your pricing into a customer quote.

Sound Familiar?

Mechanical Contractors waste hours on estimates that should take minutes

MEP piping takeoffs span many materials, schedules, and pressure classes

Coordinating piping, ductwork, plumbing, and controls in tight ceilings

Welded, brazed, grooved, and threaded joints each carry different labor

Long-lead equipment prices swing between bid and buyout

How BuildVision AI Works for Mechanical Contractors

Three steps to faster, more accurate mechanical estimates

Step 1

Upload Plans

Upload a PDF plan set or a ZIP of PDF plans.

Step 2

AI Does Takeoff

AI counts steel pipe, copper, pvc/cpvc, and more in minutes.

Step 3

Send Quote

Generate professional proposals and win more jobs.

Built for Mechanical Takeoffs

Features designed specifically for mechanical contractors

Mechanical Takeoff

Count items and measure lengths and areas from your PDF plans

Quantity Review

Check quantities for steel pipe, copper and pvc/cpvc against the drawings and specifications

Your Pricing

Apply your own material and labor prices to the reviewed quantities

Customer Quotes

Prepare an editable quote and share a link with your customer

Complete Mechanical Material Takeoffs

AI tracks every material you need - nothing gets missed

Steel Pipe
Copper
PVC/CPVC
Valves
Fittings
Boilers
Chillers
Pumps
Ductwork
Pipe Insulation
Hangers & Supports

Measurements We Calculate

Pipe Linear Feet
Weld/Joint Count
Equipment Count
Duct Linear Feet
Valve Count

Costly Mistakes Mechanical Contractors Make

Check every bid for these before it goes out

✕

Missing valves, specialties, and in-line fittings

✕

Underestimating weld and joint labor

✕

Forgetting pipe insulation and jacketing

✕

Not accounting for hangers, supports, and seismic bracing

Need Full Mechanical Estimates, Not Just Takeoffs?

Turn your mechanical takeoffs into priced bills of quantities with labor and material costs.

Explore Mechanical Estimating Software

From measured scope to priced work

Review mechanical quantities by system and connection type

Illustrative hydronic run with 120 LF shown in plan and two 10-foot vertical rises. Keep supply and return distinct unless both are included in the measured scope.

Installed pipe

120 + (2 × 10) = 140 LF for this run

Confirm diameter, material, pressure class and sheet references against the specification.

Purchasing allowance

140 × 1.05 = 147 LF

This example uses 5%; retain the installed 140 LF for labor if that is your assembly basis.

Before this becomes a quote

  • Count fittings, valves, joints and supports from details; length alone cannot determine them.
  • Separate insulation, controls, equipment setting, access, testing and commissioning responsibilities.

Keep sheet and revision references with measured quantities. Apply your supplier prices and labor rates only after reviewing the scope. The exercise above illustrates the calculation; it is not an automatically generated or independently reviewed project estimate.

Built for Mechanical Contractors

Stop Wasting Time on Mechanical Takeoffs

Let AI handle the counting and measuring, then review the quantities. See it on your own drawings.