In construction estimating

Cleanout

An accessible fitting with a removable plug in a drain or sewer line that lets plumbers insert a cable or camera to clear blockages and inspect the pipe.

Definition

A cleanout is an access point in a drain, waste, or sewer pipe, usually a wye or tee fitting with a threaded removable plug, that lets a plumber run a drain cable, jetter, or inspection camera into the line without cutting the pipe. A sewer cleanout specifically gives access to the building sewer that runs from the house or building to the public sewer main or septic system.

Plumbing codes such as the IPC and UPC require cleanouts at specific locations: at the base of drainage stacks, near the junction of the building drain and the building sewer, at changes of direction in horizontal drains, and at maximum spacing intervals along long horizontal runs. Cleanouts must stay accessible, with clearance in front of the opening for rodding equipment, so they are finished with floor cleanout covers, wall access plates, or yard cleanout boxes depending on location.

How cleanout is used in estimating

On plumbing drawings, cleanouts are shown with standard abbreviations such as CO, FCO (floor cleanout), WCO (wall cleanout), GCO (grade cleanout), or COTG (cleanout to grade), and the symbol legend defines each one. The plumbing specifications list the cleanout body material, cover finish, and load rating, which matters for cleanouts in traffic areas, parking lots, or finished floors.

Estimators count cleanouts as each (EA), separated by type and size, since a floor cleanout with a heavy-duty cover costs very differently from a simple test tee in a wall. Each cleanout often has associated scope that needs its own line: the extension pipe to grade, a concrete pad or traffic box outside, and floor or wall patching. Watch for cleanouts required by code but not drawn, particularly at changes of direction on the site sewer.

Common cleanout estimating mistakes

The most common error is counting only the cleanouts drawn on the plans and missing the ones the code requires at stack bases, sewer connections, and changes of direction. Another is pricing a floor cleanout without its finished cover, or pricing an interior cover where the location calls for a traffic-rated one. On site work, estimators forget the riser pipe and box for cleanouts brought up to grade. Walk every sanitary run from fixture to sewer and check each turn and stack against the code requirements before finalizing the count.

Frequently asked questions

Q.Where is the sewer cleanout located?

On many houses the main sewer cleanout is outside near the foundation, often a capped pipe a few inches above grade, or in a basement or crawlspace near where the drain leaves the building. On commercial projects, its location is shown on the plumbing and site utility drawings.

Q.Are cleanouts required by code?

Yes. Model plumbing codes require cleanouts at the base of stacks, near the building drain to building sewer connection, at certain changes of direction, and at set intervals along long horizontal drains. The locally adopted code sets the exact requirements.

Q.What does FCO mean on plumbing drawings?

FCO stands for floor cleanout, a cleanout brought up flush with the finished floor and capped with a removable cover. Related abbreviations include WCO for wall cleanout and COTG or GCO for cleanout to grade.

Q.How are cleanouts priced in an estimate?

Cleanouts are counted as each, by type and size, and priced with their fitting, plug, cover, and labor. Exterior cleanouts usually add an extension riser and a box or concrete pad, which estimators carry as part of the cleanout assembly.

BuildVision AI

Save time with AI-powered estimating

Producing accurate cleanout the manual way takes hours. BuildVision AI reads your drawings and generates structured takeoffs and BOQs in minutes, ready for your own pricing.

AI takeoffs

Direct from PDF plans, uploaded as one PDF or a ZIP of PDFs.

BOQ generation

Itemized bills of quantities ready for pricing or owner submission.

Quote and bid

Branded quotes priced with your own rates, shared as a link.

First takeoff free · No card · $299/seat/month after

Cleanout (Sewer Cleanout): Definition | Glossary