BuildVision AIBuildVision AI
Built for Waterproofing Contractors

Waterproofing Estimating Software That Actually Works

Prepare waterproofing takeoffs from PDF plans. Measure and count, review quantities, and export an Excel takeoff.

Sound Familiar?

Waterproofing Contractors waste hours on estimates that should take minutes

Below-grade wall area calculations

Different systems for different conditions

Drainage board and fabric needs

Foundation complexity varies

How BuildVision AI Works for Waterproofing Contractors

Three steps to faster, more accurate waterproofing estimates

Step 1

Upload Plans

Upload a PDF plan set or a ZIP of PDF plans.

Step 2

AI Does Takeoff

AI counts membrane, drainage board, filter fabric, and more in minutes.

Step 3

Export

Download an Excel takeoff and a marked-up PDF.

Built for Waterproofing Takeoffs

Features designed specifically for waterproofing contractors

Waterproofing Takeoff

Count items and measure lengths and areas from your PDF plans

Quantity Review

Check quantities for membrane, drainage board and filter fabric against the drawings and specifications

Your Pricing

Apply your own material and labor prices to the reviewed quantities

Excel and PDF Export

Export an Excel takeoff, a marked-up PDF, or a package of both

Complete Waterproofing Material Takeoffs

AI tracks every material you need - nothing gets missed

Membrane
Drainage Board
Filter Fabric
Drain Tile
Gravel
Sealant
Primer
Protection Board
Termination Bar
Mastic

Measurements We Calculate

Square Feet
Linear Feet (footings)
Linear Feet (drain tile)
Cubic Yards (gravel)
Gallons (coatings)

Costly Mistakes Waterproofing Contractors Make

Check every bid for these before it goes out

✕

Missing below-grade areas

✕

Underestimating drainage requirements

✕

Forgetting termination details

✕

Not accounting for backfill protection

From measured scope to priced work

Include upstands and details in waterproofing quantities

Illustrative 20 ft × 15 ft deck with a continuous 1-foot upstand around the perimeter.

Base membrane area

(20 × 15) + (2 × (20 + 15) × 1) = 370 SF

This excludes laps, terminations, penetrations and product-specific overlap allowances.

Before this becomes a quote

  • Identify substrate, membrane system, corners and drainage details.
  • Price preparation, primer, protection and testing separately using the specified system.

Keep sheet and revision references with measured quantities. Apply your supplier prices and labor rates only after reviewing the scope. The exercise above illustrates the calculation; it is not an automatically generated or independently reviewed project estimate.

Built for Waterproofing Contractors

Stop Wasting Time on Waterproofing Takeoffs

Let AI handle the counting and measuring, then review the quantities. See it on your own drawings.

First takeoff free · No card · $299/seat/month after

Waterproofing Estimating & Takeoff Software | PDF Plans