A submittal is a document or sample — such as shop drawings, product data, or material samples — that a contractor sends to the architect or engineer for review to confirm it meets the design before the item is fabricated or installed.
A submittal is information the contractor submits to the design team to show exactly what will be furnished and installed for a given part of the work. The most common types are shop drawings, product data sheets, samples, mock-ups, and test reports or certificates. The architect or engineer reviews each submittal for general conformance with the design intent and the contract documents, and returns it with a status such as approved, approved as noted, revise and resubmit, or rejected.
Submittals bridge the gap between the design, which states performance and appearance requirements, and the specific products and fabrication details the contractor intends to use. Submittal requirements are defined in the project specifications — in CSI MasterFormat, the general procedures appear in Section 01 33 00 Submittal Procedures, and each technical section lists its own required submittals in Part 1.
On a typical project, the general contractor builds a submittal register that lists every required submittal from every specification section, assigns each to a subcontractor or supplier, and tracks due dates, review time, and status. Subcontractors prepare the package, the GC reviews it for completeness and coordination, and it is forwarded to the architect. Long-lead items such as switchgear, elevators, structural steel, and curtain wall are prioritized because fabrication cannot start until the submittal is approved.
For estimators, the specifications’ submittal requirements are a scope signal. Required mock-ups, delegated design submittals, engineered shop drawings, testing, and certifications all carry cost that is not visible on the drawings. Named products and “or equal” language in the specs also determine whether a substitution can be priced in the bid or must go through a formal substitution request.
Read the Part 1 submittal requirements of every specification section in your scope during takeoff, not after award. Carry the cost of mock-ups, physical samples, engineering stamps for delegated design, and any third-party testing, and confirm that subcontract scopes include preparing their own submittals. Also build realistic review durations into the schedule, because a rejected submittal on a long-lead item can delay the project. The most common estimating mistake is pricing a lower-cost product that will not pass submittal review against the specified basis of design, leaving the contractor to absorb the difference.
In construction, a submittal is any document, drawing, product information, or sample the contractor provides to the architect or engineer for review before fabricating or installing an item. It confirms that what will be built matches the design intent of the contract documents.
The main types are shop drawings, product data, samples, and mock-ups. Specifications may also require informational submittals such as test reports, certificates, qualification statements, warranties, and operation and maintenance data.
A submittal shows the design team what the contractor intends to provide, for their review. An RFI (request for information) asks the design team a question to clarify something unclear or conflicting in the contract documents. Submittals confirm compliance; RFIs resolve ambiguity.
Generally no. Under standard general conditions such as AIA A201, review of a submittal does not relieve the contractor of meeting the contract documents, and deviations must be specifically identified and accepted in writing. Changes in scope or cost should be handled through a change order.
Producing accurate submittal the manual way takes hours. BuildVision AI reads your drawings and generates structured takeoffs and BOQs in minutes, ready for your own pricing.
Direct from PDF plans, uploaded as one PDF or a ZIP of PDFs.
Itemized bills of quantities ready for pricing or owner submission.
Branded quotes priced with your own rates, shared as a link.
First takeoff free · No card · $299/seat/month after