BuildVision AIBuildVision AI
Built for Fireproofing Contractors

Fireproofing Estimating Software That Actually Works

Prepare fireproofing takeoffs from PDF plans. Measure and count, review quantities, and export an Excel takeoff.

Sound Familiar?

Fireproofing Contractors waste hours on estimates that should take minutes

Steel surface area calculations

Different thickness requirements

Intumescent vs SFRM systems

Coverage rates vary by product

How BuildVision AI Works for Fireproofing Contractors

Three steps to faster, more accurate fireproofing estimates

Step 1

Upload Plans

Upload a PDF plan set or a ZIP of PDF plans.

Step 2

AI Does Takeoff

AI counts sfrm, intumescent paint, primer, and more in minutes.

Step 3

Export

Download an Excel takeoff and a marked-up PDF.

Built for Fireproofing Takeoffs

Features designed specifically for fireproofing contractors

Fireproofing Takeoff

Count items and measure lengths and areas from your PDF plans

Quantity Review

Check quantities for sfrm, intumescent paint and primer against the drawings and specifications

Your Pricing

Apply your own material and labor prices to the reviewed quantities

Excel and PDF Export

Export an Excel takeoff, a marked-up PDF, or a package of both

Complete Fireproofing Material Takeoffs

AI tracks every material you need - nothing gets missed

SFRM
Intumescent Paint
Primer
Firestop
Wrap
Board
Sealant
Mesh
Anchors
Inspection Tags

Measurements We Calculate

Square Feet
Linear Feet (beams)
Bags (SFRM)
Gallons (paint)
Thickness

Costly Mistakes Fireproofing Contractors Make

Check every bid for these before it goes out

✕

Wrong thickness for rating

✕

Missing deck underside

✕

Underestimating overspray waste

✕

Forgetting edge details

From measured scope to priced work

Use the specified fireproofing system to define quantities

Illustrative member with a specified coated perimeter of 4 ft over a 25-foot length. Verify the actual exposed faces and tested assembly.

Coated surface

4 × 25 = 100 SF before deductions or allowances

A floor area is not a steel surface area. Thickness and coverage depend on the specified assembly.

Before this becomes a quote

  • Group members by system and required thickness; obtain manufacturer coverage data.
  • Separate masking, preparation, access, inspection and repairs. Quantity arithmetic does not certify fire performance.

Keep sheet and revision references with measured quantities. Apply your supplier prices and labor rates only after reviewing the scope. The exercise above illustrates the calculation; it is not an automatically generated or independently reviewed project estimate.

Built for Fireproofing Contractors

Stop Wasting Time on Fireproofing Takeoffs

Let AI handle the counting and measuring, then review the quantities. See it on your own drawings.

First takeoff free · No card · $299/seat/month after

Fireproofing Estimating Software | AI Takeoffs